Dong Energy

The new atrium building at Dong Energy’s Technical Village in Virum is simply impressive.

The striking stepped ramp creates a unique atmosphere, with visible beams beneath the glass ceiling forming the “sky” of the atrium itself. This was a complete Give Steel solution, with the company supplying the spectacular stepped ramp along with 140,000 kg of steel beams. The steel structures included ceiling trusses and large HEM-profiled trusses, chosen to accommodate the dynamic loads generated by the massive stepped ramp.

Dahl Entreprise was the construction contractor for the project, which was completed in December 2013. Dong Energy moved in during the spring of 2014.

Whether you are in the early design phase or ready to request a quotation, our specialists are here to advise on steel structures, design optimisation, CO2 reduction and project-specific documentation. Get in touch and let us know about your project. We'd be happy to discuss how we can support you.

Contact us today!

Give Steel

Sales and Technical Department

Mads Emil Holmgaard Madsen

Sales Engineer

Tel.: +45 61 42 01 02

E-mail: meh@givesteel.com