Jordal Amfi Arena

Give Steel hoists the first trusses into position at another sports arena, this time the Jordal Amfi Hockey Arena in Oslo. The trusses span almost 60 metres and are assembled on-site.

Give Steel supplied a total of 500 tons of steel to the new Arena. The building was completed in September 2019 and can seat up to 6,000 spectators.

Jordal Amfi Arena

Give Steel hoists the first trusses into position at another sports arena, this time the Jordal Amfi Hockey Arena in Oslo. The trusses span almost 60 metres and are assembled on-site.

Give Steel supplied a total of 500 tons of steel to the new Arena. The building was completed in September 2019 and can seat up to 6,000 spectators.