Sieverts
Sieverts’ cow sheds in northern Germany were dimensioned and drawn by Give Steel’s German branch in Neumünster.
A total of 180 tonnes of galvanised steel frames were distributed across three 4,000 m² sheds. The sheds were to have solar panels installed on the roofs, and construction was therefore subject to the deadline for solar energy subsidies. Despite the extremely tight schedule, Give Steel managed to erect the entire project in just one and a half weeks.
This achievement must surely be a record for a project of this size.