Sieverts kostaldene i Nordtyskland blev dimensioneret og tegnet af Give Steels tyske afdeling i Neumünster.
180 ton galvaniserede spær blev fordelt på tre haller af 4.000 m2. Kostaldene skulle have monteret solceller på tagene og var derfor afhængig af deadline for tilskud til solenergi. Det gjorde projektets tidsplan særlig presset, men Give Steel A/S formåede at montere hele projektet på bare halvanden uge.
En bedrift som må siges at sætte rekord for et projekt af denne størrelse.
Sieverts
Sieverts’ cow sheds in Northern Germany were dimensioned and drawn by Give Steel’s German branch in Neumünster.
180 tons of galvanised steel frames distributed among three 4,000m2 sheds. The sheds were to have solar cells fitted on the roofs, and building work was therefore subject to the deadline for solar energy subsidies. Although the schedule for the project was extremely tight, Give Steel managed to erect the entire project in just one and a half weeks.
This accomplishment must surely be a record for a project of this size.