Køgehallerne
The steel frames that support the roof structure each weigh 5.5 tons and are 40 metres in length. For installation, we used a 130 ton mobile crane with a 36-metre hoist.
Hall 3 at Køge leisure park will have an area of 4,200m2 and seat 1,100 spectators. The total budget for the project is DKK 46 million.