Clarion Hotel Copenhagen Airport

Eight-metre-high ceilings, no columns, yet still bearing the weight of 12 storeys and 200 hotel rooms. Give Steel’s specially constructed steel structures made the impossible possible at The Hangar, Northern Europe’s largest conference centre, built with a direct connection to the airport. Thanks to this new conference centre, Clarion Hotel and Copenhagen as a conference and congress city are now well equipped for the years following the coronavirus pandemic.

Three specially constructed steel frames, each weighing 65 tonnes and measuring 30 metres in length, form the skeleton of The Hangar — a 2,500 m² conference centre with a direct link to Copenhagen Airport.

Whether you are in the early design phase or ready to request a quotation, our specialists are here to advise on steel structures, design optimisation, CO2 reduction and project-specific documentation. Get in touch and let us know about your project. We'd be happy to discuss how we can support you.

Contact us today!

Give Steel

Sales and Technical Department

Mads Emil Holmgaard Madsen

Sales Engineer

Tel.: +45 61 42 01 02

E-mail: meh@givesteel.com