Postgrunden, Copenhagen Central

The need for individual beam solutions is greater than ever. Give Steel delivers a total of 1,648 GSY BEAMS® to Postgrunden, Copenhagen Central. Virtually all GSY BEAMS® each have their own individual design.

1,648 composite beams in individual design

The many GSY BEAMS® almost all have their own individual designs. The order is the largest GSY order in Give Steel’s history and the assembly is progressing efficiently. On average, the assembly takes three weeks per. floor.

Give Steel supplies a total of 3,095 tonnes of steel construction for the project, including large welded beams, heavy trusses over open atriums, construction steel for footbridges and as much as 950 tonnes of roof steel in addition to 45 tonnes of secondary steel. The last delivery of steel structures to Postgrunden is planned for October 2021.

The need for individual beam solutions is greater than ever. Give Steel delivers a total of 1,648 GSY BEAMS® to Postgrunden, Copenhagen Central. Virtually all GSY BEAMS each have their own individual design.

1,648 composite beams in individual design

The many GSY BEAMS® almost all have their own individual designs. The order is the largest GSY® order in Give Steel’s history and the assembly is progressing efficiently. On average, the assembly takes three weeks per. floor.

Give Steel supplies a total of 3,095 tonnes of steel construction for the project, including large welded beams, heavy trusses over open atriums, construction steel for footbridges and as much as 950 tonnes of roof steel in addition to 45 tonnes of secondary steel. The last delivery of steel structures to Postgrunden is planned for October 2021.